IAC logo
IAC Assessment: MA0706
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0706
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Plastic film
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 36,000
Annual Production 29,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $898,172 9,049,300 kWh $0.10
Electricity Demand $58,408 14,900 kW-months/year $3.92
Electricity Fees $2,400 - $ -
Natural Gas $1,129 102 MMBtu $11.07
TOTAL ENERGY COSTS $960,109
RECOMMENDED SAVINGS* $20,186 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,935
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$9,814
Cost:
$10,900
$9,814 98,832 - - $9,814
98,832
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,037
Cost:
$6,900
$4,037 40,650 - - $4,037
40,650
kWh
-
-
MMBtu
03: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$4,016
Cost:
$26,000
$4,016 40,451 - - $4,016
40,451
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,105
Cost:
$100
$928 9,350 $177 16 $928
9,350
kWh
$177
16
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$864
Cost:
$300
$864 8,705 - - $864
8,705
kWh
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$350
Cost:
$450
$350 3,618 - - $350
3,618
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,186
Cost:
$44,650
$20,009 201,606 $177 16 $20,009
201,606
kWh
$177
16
MMBtu
TOTAL IMPLEMENTED Savings:
$14,935
Cost:
$37,000
$14,758 148,633 $177 16 $14,758
148,633
kWh
$177
16
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas