IAC logo
IAC Assessment: MA0707
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0707
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Semiconductor industry capital equipment
NAICS 333242 - Semiconductor Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 32,000
Annual Production 15 Pieces
Production Hrs. Annual 3,380
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,793 894,800 kWh $0.10
Electricity Demand $9,927 2,456 kW-months/year $4.04
Electricity Fees $2,370 - $ -
Natural Gas $137 16 MMBtu $8.56
TOTAL ENERGY COSTS $100,227
RECOMMENDED SAVINGS* $17,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,997
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,613
Cost:
$1,000
$18,837 190,084 $1,090 278 $(-5,314) (-721) $18,837
190,084
kWh
$1,090
278
kW-months/year
$(-5,314)
(-721)
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$972
Cost:
$200
$972 9,804 - - - - $972
9,804
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$807
Cost:
$1,840
$807 8,145 - - - - $807
8,145
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$439
Cost:
$3,057
- - $439 112 - - -
-
kWh
$439
112
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$412
Cost:
$200
$412 4,157 - - - - $412
4,157
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$17,243
Cost:
$6,297
$21,028 212,190 $1,529 390 $(-5,314) (-721) $21,028
212,190
kWh
$1,529
390
kW-months/year
$(-5,314)
(-721)
MMBtu
TOTAL IMPLEMENTED Savings:
$15,997
Cost:
$1,400
$20,221 204,045 $1,090 278 $(-5,314) (-721) $20,221
204,045
kWh
$1,090
278
kW-months/year
$(-5,314)
(-721)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas