IAC logo
IAC Assessment: MA0708
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0708
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Thermal imaging lens elements and lens assemblies
NAICS 333314 - Optical Instrument and Lens Manufacturing
SIC 3827 - Optical Instruments And Lenses
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 32,727
Annual Production 225,000 Pieces
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,799 1,770,837 kWh $0.10
Other Energy $24,313 1,875 MMBtu $12.97
TOTAL ENERGY COSTS $195,112
RECOMMENDED SAVINGS* $12,914 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,968
#|Description Savings
Cost
Status Electricity Usage Other Energy Electricity Usage Other Energy
$ kWh $ MMBtu
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$4,752
Cost:
$30,000
$4,752 49,239 - - $4,752
49,239
kWh
-
-
MMBtu
02: 2.7314 REDUCE VENTILATION AIR Savings:
$3,194
Cost:
$7,450
$1,741 18,042 $1,453 112 $1,741
18,042
kWh
$1,453
112
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,140
Cost:
$400
$3,140 32,544 - - $3,140
32,544
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,828
Cost:
$3,200
$1,828 18,938 - - $1,828
18,938
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,914
Cost:
$41,050
$11,461 118,763 $1,453 112 $11,461
118,763
kWh
$1,453
112
MMBtu
TOTAL IMPLEMENTED Savings:
$4,968
Cost:
$3,600
$4,968 51,482 - - $4,968
51,482
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Other Energy Electricity Usage Other Energy