IAC logo
IAC Assessment: MA0709
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0709
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product treated drinking water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 4
Plant Area (Sq.Ft.) 38,900
Annual Production 9,106,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $593,940 5,025,572 kWh $0.12
Electricity Demand $93,939 9,138 kW-months/year $10.28
Natural Gas $39,253 4,318 MMBtu $9.09
Fuel Oil #2 $3,704 136 MMBtu $27.24
TOTAL ENERGY COSTS $730,836
RECOMMENDED SAVINGS* $46,435 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $588
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,306
Cost:
$74,300
$25,306 214,099 - - $25,306
214,099
kWh
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$15,578
Cost:
$162,500
$15,578 131,799 - - $15,578
131,799
kWh
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,963
Cost:
$60,000
$6,917 58,520 $(-1,954) (-215) $6,917
58,520
kWh
$(-1,954)
(-215)
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$588
Cost:
$200
$588 4,977 - - $588
4,977
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$46,435
Cost:
$297,000
$48,389 409,395 $(-1,954) (-215) $48,389
409,395
kWh
$(-1,954)
(-215)
MMBtu
TOTAL IMPLEMENTED Savings:
$588
Cost:
$200
$588 4,977 - - $588
4,977
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas