IAC Assessment: MA0720
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0720
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Optic fiber cables
NAICS 335921 - Fiber Optic Cable Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 123,750
Annual Production 5,040 Pieces
Production Hrs. Annual 6,120
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $283,286 3,744,000 kWh $0.08
Electricity Demand $100,406 8,883 kW-months/year $11.30
Electricity Fees $6,835 - $ -
Natural Gas $101,948 11,599 MMBtu $8.79
TOTAL ENERGY COSTS $492,475
RECOMMENDED SAVINGS* $62,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,882
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$13,659
Cost:
$200
- - - - - - $13,659 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,659
-
$
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$10,748
Cost:
$1,000
$10,748 140,865 - - - - - - $10,748
140,865
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,121
Cost:
$12,390
- - $10,121 896 - - - - -
-
kWh
$10,121
896
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$8,238
Cost:
$10,000
$8,238 107,970 - - - - - - $8,238
107,970
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7314 REDUCE VENTILATION AIR Savings:
$7,186
Cost:
$2,510
$2,296 30,094 - - $4,890 572 - - $2,296
30,094
kWh
-
-
kW-months/year
$4,890
572
MMBtu
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,682
Cost:
$500
$5,682 74,475 - - - - - - $5,682
74,475
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7314 REDUCE VENTILATION AIR Savings:
$4,116
Cost:
$2,500
$2,192 28,733 - - $1,924 225 - - $2,192
28,733
kWh
-
-
kW-months/year
$1,924
225
MMBtu
-
-
$
08: 2.7314 REDUCE VENTILATION AIR Savings:
$2,479
Cost:
$6,235
$1,590 20,841 - - $889 104 - - $1,590
20,841
kWh
-
-
kW-months/year
$889
104
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$62,229
Cost:
$35,335
$30,746 402,978 $10,121 896 $7,703 901 $13,659 - $30,746
402,978
kWh
$10,121
896
kW-months/year
$7,703
901
MMBtu
$13,659
-
$
TOTAL IMPLEMENTED Savings:
$46,882
Cost:
$26,090
$21,178 277,568 $10,121 896 $1,924 225 $13,659 - $21,178
277,568
kWh
$10,121
896
kW-months/year
$1,924
225
MMBtu
$13,659
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes