IAC Center University of Massachusetts
Assessment Year 2014
Principal Product Jet engine components
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $100,000,000
# of Employees 1,291
Plant Area (Sq.Ft.) 876,960
Annual Production 1,000 Pieces
Production Hrs. Annual 8,400
Location (State) ME
Source Yearly Cost Usage
Electricity Usage $3,412,448 44,844,161
Electricity Demand $87,909 84,897
Electricity Fees $28,010 -
Natural Gas $903,036 118,795
TOTAL ENERGY COSTS $4,431,403
RECOMMENDED SAVINGS* $74,882 *Non-energy impacts
included in savings.
IMPLEMENTED SAVINGS* $63,835
#|Description Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4232 ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING Savings:
$23,304
Cost:
$90,000
$23,304 297,642 - - $23,304
297,642
kWh
-
-
MMBtu
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$20,745
Cost:
$110,500
$20,745 264,944 - - $20,745
264,944
kWh
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$16,628
Cost:
$5,000
$8,413 107,451 $8,215 1,091 $8,413
107,451
kWh
$8,215
1,091
MMBtu
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$11,047
Cost:
$32,000
- - $11,047 1,467 -
-
kWh
$11,047
1,467
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,158
Cost:
$1,250
$3,158 40,331 - - $3,158
40,331
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$74,882
Cost:
$238,750
$55,620 710,368 $19,262 2,558 $55,620
710,368
kWh
$19,262
2,558
MMBtu
TOTAL IMPLEMENTED Savings:
$63,835
Cost:
$206,750
$55,620 710,368 $8,215 1,091 $55,620
710,368
kWh
$8,215
1,091
MMBtu
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas
Back to Top