IAC logo
IAC Assessment: MA0728
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0728
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2014
Principal Product Standard and Special cuttingTools
NAICS 333517 - Machine Tool Manufacturing
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $5,000,000-$10,000,000
# of Employees 44
Plant Area (Sq.Ft.) 55,000
Annual Production 4,160 Pieces
Production Hrs. Annual 4,080
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,470 1,140,585 kWh $0.07
Electricity Demand $57,350 6,681 kW-months/year $8.58
Electricity Fees $23,366 - $ -
LPG $26,391 1,507 MMBtu $17.51
Fuel Oil #4 $41,251 1,874 MMBtu $22.01
TOTAL ENERGY COSTS $254,930
RECOMMENDED SAVINGS* $29,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,566
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #4 Water Disposal Electricity Usage LPG Fuel Oil #4 Water Disposal
$ kWh $ MMBtu $ MMBtu $ Tgal
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$16,512
Cost:
$25,775
- - $(-6,708) (-383) $23,220 1,060 - - -
-
kWh
$(-6,708)
(-383)
MMBtu
$23,220
1,060
MMBtu
-
-
Tgal
02: 2.1224 REPLACE BOILER Savings:
$10,114
Cost:
$30,450
- - $(-30,916) (-1,765) $41,030 1,873 - - -
-
kWh
$(-30,916)
(-1,765)
MMBtu
$41,030
1,873
MMBtu
-
-
Tgal
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$2,940
Cost:
$6,500
$(-1,636) (-21,812) - - - - $4,576 933 $(-1,636)
(-21,812)
kWh
-
-
MMBtu
-
-
MMBtu
$4,576
933
Tgal
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$324
Cost:
$350
- - - - $324 15 - - -
-
kWh
-
-
MMBtu
$324
15
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$29,890
Cost:
$63,075
$(-1,636) (-21,812) $(-37,624) (-2,148) $64,574 2,948 $4,576 933 $(-1,636)
(-21,812)
kWh
$(-37,624)
(-2,148)
MMBtu
$64,574
2,948
MMBtu
$4,576
933
Tgal
TOTAL IMPLEMENTED Savings:
$29,566
Cost:
$62,725
$(-1,636) (-21,812) $(-37,624) (-2,148) $64,250 2,933 $4,576 933 $(-1,636)
(-21,812)
kWh
$(-37,624)
(-2,148)
MMBtu
$64,250
2,933
MMBtu
$4,576
933
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ Tgal
Electricity Usage LPG Fuel Oil #4 Water Disposal Electricity Usage LPG Fuel Oil #4 Water Disposal