IAC Assessment: MA0730
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0730
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2014
Principal Product Processed laundry
NAICS 812332 - Industrial Launderers
SIC 7218 - Industrial Launderers
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 80,000
Annual Production 11,600,000 Pounds
Production Hrs. Annual 3,900
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $189,673 1,757,100 kWh $0.11
Electricity Demand $61,550 5,273 kW-months/year $11.67
Electricity Fees $24,626 - $ -
Natural Gas $245,039 30,045 MMBtu $8.16
TOTAL ENERGY COSTS $642,437
RECOMMENDED SAVINGS* $25,882 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,703
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,229
Cost:
$5,000
- - - - $18,229 3,092 -
-
kWh
-
-
MMBtu
$18,229
3,092
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,618
Cost:
$4,285
$4,618 42,802 - - - - $4,618
42,802
kWh
-
-
MMBtu
-
-
Tgal
03: 2.7314 REDUCE VENTILATION AIR Savings:
$1,607
Cost:
$4,600
$453 4,196 $1,154 168 - - $453
4,196
kWh
$1,154
168
MMBtu
-
-
Tgal
04: 2.7314 REDUCE VENTILATION AIR Savings:
$524
Cost:
$1,300
$57 525 $467 68 - - $57
525
kWh
$467
68
MMBtu
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$478
Cost:
$300
$478 4,430 - - - - $478
4,430
kWh
-
-
MMBtu
-
-
Tgal
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$426
Cost:
$1,200
- - $426 62 - - -
-
kWh
$426
62
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$25,882
Cost:
$16,685
$5,606 51,953 $2,047 298 $18,229 3,092 $5,606
51,953
kWh
$2,047
298
MMBtu
$18,229
3,092
Tgal
TOTAL IMPLEMENTED Savings:
$6,703
Cost:
$9,185
$5,549 51,428 $1,154 168 - - $5,549
51,428
kWh
$1,154
168
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal