IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2014
Principal Product Electroplated parts
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 49
Plant Area (Sq.Ft.) 70,000
Annual Production 40,000 Pieces
Production Hrs. Annual 3,120
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,769 2,753,280 kWh $0.08
Electricity Demand $101,028 9,054 kW-months/year $11.16
Electricity Fees $(-9,566) - $ -
Natural Gas $267,906 34,342 MMBtu $7.80
TOTAL ENERGY COSTS $571,137
RECOMMENDED SAVINGS* $33,048 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,233
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,815
Cost:
$17,955
- - $23,815 2,134 - - - - -
-
kWh
$23,815
2,134
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,745
Cost:
$3,519
- - - - $3,745 603 - - -
-
kWh
-
-
kW-months/year
$3,745
603
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,084
Cost:
$500
- - - - - - $3,084 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,084
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,027
Cost:
$3,000
$1,027 13,354 - - - - - - $1,027
13,354
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,377
Cost:
$4,200
$1,377 17,901 - - - - - - $1,377
17,901
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,048
Cost:
$29,174
$2,404 31,255 $23,815 2,134 $3,745 603 $3,084 - $2,404
31,255
kWh
$23,815
2,134
kW-months/year
$3,745
603
MMBtu
$3,084
-
$
TOTAL IMPLEMENTED Savings:
$9,233
Cost:
$11,219
$2,404 31,255 - - $3,745 603 $3,084 - $2,404
31,255
kWh
-
-
kW-months/year
$3,745
603
MMBtu
$3,084
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $