Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2015 |
Principal Product | Gates, valves & water control equipment |
NAICS | 332911 - Industrial Valve Manufacturing |
SIC | 3491 - Industrial Valves |
Sales | $50,000,000-$100,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 245,668 |
Annual Production | 1,500 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $773,160 | 6,902,600 | kWh | $0.11 |
Electricity Demand | $68,553 | 17,302 | kW-months/year | $3.96 |
Electricity Fees | $19,144 | - | $ | - |
LPG | $374,692 | 19,271 | MMBtu | $19.44 |
Fuel Oil #6 | $347,826 | 18,595 | MMBtu | $18.71 |
TOTAL ENERGY COSTS | $1,583,375 | |||
RECOMMENDED SAVINGS* | $95,372 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $71,037 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $59,139 Cost: $500 |
- | - | - | - | $59,139 | - |
- - kWh |
- - MMBtu |
$59,139 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $11,551 Cost: $1,000 |
$4,181 | 37,331 | $7,370 | 419 | - | - |
$4,181 37,331 kWh |
$7,370 419 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,739 Cost: $11,430 |
$9,739 | 86,956 | - | - | - | - |
$9,739 86,956 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $5,924 Cost: $3,000 |
$1,227 | 10,951 | $4,697 | 267 | - | - |
$1,227 10,951 kWh |
$4,697 267 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,433 Cost: $8,441 |
- | - | $4,433 | 252 | - | - |
- - kWh |
$4,433 252 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,239 Cost: $2,000 |
- | - | $4,239 | 241 | - | - |
- - kWh |
$4,239 241 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $347 Cost: $400 |
$347 | 3,095 | - | - | - | - |
$347 3,095 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $95,372 Cost: $26,771 |
$15,494 | 138,333 | $20,739 | 1,179 | $59,139 | - | $15,494 138,333 kWh |
$20,739 1,179 MMBtu |
$59,139 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $71,037 Cost: $1,900 |
$4,528 | 40,426 | $7,370 | 419 | $59,139 | - | $4,528 40,426 kWh |
$7,370 419 MMBtu |
$59,139 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes |