IAC Assessment: MA0738
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0738
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Gates, valves & water control equipment
NAICS 332911 - Industrial Valve Manufacturing
SIC 3491 - Industrial Valves
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 245,668
Annual Production 1,500 Tons
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $773,160 6,902,600 kWh $0.11
Electricity Demand $68,553 17,302 kW-months/year $3.96
Electricity Fees $19,144 - $ -
LPG $374,692 19,271 MMBtu $19.44
Fuel Oil #6 $347,826 18,595 MMBtu $18.71
TOTAL ENERGY COSTS $1,583,375
RECOMMENDED SAVINGS* $95,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,037
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$59,139
Cost:
$500
- - - - $59,139 - -
-
kWh
-
-
MMBtu
$59,139
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,551
Cost:
$1,000
$4,181 37,331 $7,370 419 - - $4,181
37,331
kWh
$7,370
419
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,739
Cost:
$11,430
$9,739 86,956 - - - - $9,739
86,956
kWh
-
-
MMBtu
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,924
Cost:
$3,000
$1,227 10,951 $4,697 267 - - $1,227
10,951
kWh
$4,697
267
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,433
Cost:
$8,441
- - $4,433 252 - - -
-
kWh
$4,433
252
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,239
Cost:
$2,000
- - $4,239 241 - - -
-
kWh
$4,239
241
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$347
Cost:
$400
$347 3,095 - - - - $347
3,095
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$95,372
Cost:
$26,771
$15,494 138,333 $20,739 1,179 $59,139 - $15,494
138,333
kWh
$20,739
1,179
MMBtu
$59,139
-
$
TOTAL IMPLEMENTED Savings:
$71,037
Cost:
$1,900
$4,528 40,426 $7,370 419 $59,139 - $4,528
40,426
kWh
$7,370
419
MMBtu
$59,139
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes