Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2015 |
Principal Product | Toothpaste, mouthwash, deodorant |
NAICS | 325611 - Soap and Other Detergent Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $50,000,000-$100,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 110,475 |
Annual Production | 130,000 Pieces |
Production Hrs. Annual | 6,120 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $104,707 | 1,361,760 | kWh | $0.08 |
Electricity Demand | $41,234 | 3,952 | kW-months/year | $10.43 |
Electricity Fees | $1,959 | - | $ | - |
Natural Gas | $66,069 | 5,083 | MMBtu | $13.00 |
TOTAL ENERGY COSTS | $213,969 | |||
RECOMMENDED SAVINGS* | $10,484 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,776 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,369 Cost: $11,834 |
$5,369 | 69,811 | - | - | - | - |
$5,369 69,811 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,543 Cost: $500 |
$1,543 | 20,064 | - | - | - | - |
$1,543 20,064 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $927 Cost: $1,570 |
- | - | - | - | $927 | 77 |
- - kWh |
- - $ |
$927 77 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $880 Cost: $1,285 |
$880 | 11,440 | - | - | - | - |
$880 11,440 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $864 Cost: $2,635 |
$864 | 11,239 | - | - | - | - |
$864 11,239 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $475 Cost: $915 |
$475 | 6,177 | - | - | - | - |
$475 6,177 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $426 Cost: $500 |
- | - | $426 | - | - | - |
- - kWh |
$426 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,484 Cost: $19,239 |
$9,131 | 118,731 | $426 | - | $927 | 77 | $9,131 118,731 kWh |
$426 - $ |
$927 77 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,776 Cost: $3,855 |
$2,423 | 31,504 | $426 | - | $927 | 77 | $2,423 31,504 kWh |
$426 - $ |
$927 77 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas |