IAC logo
IAC Assessment: MA0743
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0743
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Assembled Systems
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 46,000
Annual Production 1,500 Pieces
Production Hrs. Annual 2,860
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $140,195 1,138,768 kWh $0.12
Electricity Demand $11,181 2,781 kW-months/year $4.02
Electricity Fees $9,218 - $ -
Natural Gas $35,600 2,751 MMBtu $12.94
TOTAL ENERGY COSTS $196,194
RECOMMENDED SAVINGS* $30,748 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,215
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$17,665
Cost:
$2,500
$14,912 124,058 - - $2,753 222 $14,912
124,058
kWh
-
-
$
$2,753
222
MMBtu
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$8,215
Cost:
$500
- - $8,215 - - - -
-
kWh
$8,215
-
$
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,749
Cost:
$1,426
$1,088 7,961 - - $2,661 212 $1,088
7,961
kWh
-
-
$
$2,661
212
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$406
Cost:
$980
$406 3,375 - - - - $406
3,375
kWh
-
-
$
-
-
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$373
Cost:
$500
$373 2,421 - - - - $373
2,421
kWh
-
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$340
Cost:
$300
$340 2,824 - - - - $340
2,824
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,748
Cost:
$6,206
$17,119 140,639 $8,215 - $5,414 434 $17,119
140,639
kWh
$8,215
-
$
$5,414
434
MMBtu
TOTAL IMPLEMENTED Savings:
$8,215
Cost:
$500
- - $8,215 - - - -
-
kWh
$8,215
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas