IAC Assessment: MA0744
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0744
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Complex aerospace components
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 177
Plant Area (Sq.Ft.) 83,000
Annual Production 1,200 Pieces
Production Hrs. Annual 6,300
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $321,861 3,560,400 kWh $0.09
Electricity Demand $98,601 8,958 kW-months/year $11.01
Electricity Fees $4,800 - $ -
Natural Gas $16,711 1,040 MMBtu $16.07
TOTAL ENERGY COSTS $441,973
RECOMMENDED SAVINGS* $37,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,165
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$10,197
Cost:
$27,500
$8,744 96,725 $1,453 132 - - $8,744
96,725
kWh
$1,453
132
kW-months/year
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,840
Cost:
$12,155
- - $8,840 803 - - -
-
kWh
$8,840
803
kW-months/year
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,413
Cost:
$39,000
$9,216 101,950 $2,521 229 $(-3,324) (-409) $9,216
101,950
kWh
$2,521
229
kW-months/year
$(-3,324)
(-409)
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,325
Cost:
$1,800
$5,325 58,902 - - - - $5,325
58,902
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,753
Cost:
$3,460
$1,046 11,572 - - $1,707 210 $1,046
11,572
kWh
-
-
kW-months/year
$1,707
210
MMBtu
06: 2.7314 REDUCE VENTILATION AIR Savings:
$2,077
Cost:
$500
$630 6,969 - - $1,447 178 $630
6,969
kWh
-
-
kW-months/year
$1,447
178
MMBtu
TOTAL RECOMMENDED Savings:
$37,605
Cost:
$84,415
$24,961 276,118 $12,814 1,164 $(-170) (-21) $24,961
276,118
kWh
$12,814
1,164
kW-months/year
$(-170)
(-21)
MMBtu
TOTAL IMPLEMENTED Savings:
$14,165
Cost:
$13,955
$5,325 58,902 $8,840 803 - - $5,325
58,902
kWh
$8,840
803
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas