Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: MA0746
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: MA0746
Due to University and State restrictions around the country, all IAC assessment activities are temporarily on hold.
Click here for details about Coronavirus (COVID-19) Recovery Support programs
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Cutting tools, threading taps, reamers
NAICS 333515 - Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545 - Machine Tool Accessories
Sales $16,600,000
# of Employees 161
Plant Area (Sq.Ft.) 128,000
Annual Production 2,700,000 Pieces
Production Hrs. Annual 6,120
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $490,931 5,863,100 kWh $0.08
Electricity Demand $133,201 15,744 kW/month $8.46
Electricity Fees $6,443 - $ -
LPG $17,271 793 MMBtu $21.78
Fuel Oil #6 $209,120 11,342 MMBtu $18.44
TOTAL ENERGY COSTS $856,966
RECOMMENDED SAVINGS* $52,523 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,523
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6
$ kWh $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$14,457
Cost:
$7,354
- - $14,457 784 -
-
kWh
$14,457
784
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,017
Cost:
$88,800
$14,017 167,468 - - $14,017
167,468
kWh
-
-
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$13,483
Cost:
$3,785
$1,976 23,603 $11,507 624 $1,976
23,603
kWh
$11,507
624
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,070
Cost:
$2,100
$3,070 36,683 - - $3,070
36,683
kWh
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,299
Cost:
$3,000
$3,299 39,420 - - $3,299
39,420
kWh
-
-
MMBtu
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$2,323
Cost:
$362
- - $2,323 126 -
-
kWh
$2,323
126
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,874
Cost:
$2,960
$1,874 22,394 - - $1,874
22,394
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$52,523
Cost:
$108,361
$24,236 289,568 $28,287 1,534 $24,236
289,568
kWh
$28,287
1,534
MMBtu
TOTAL IMPLEMENTED Savings:
$52,523
Cost:
$108,361
$24,236 289,568 $28,287 1,534 $24,236
289,568
kWh
$28,287
1,534
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6