IAC logo
IAC Assessment: MA0752
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0752
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product aluminum cans
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $100,000,000-$500,000,000
# of Employees 215
Plant Area (Sq.Ft.) 290,000
Annual Production 3,360,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,782,265 35,397,773 kWh $0.08
Natural Gas $805,178 189,009 MMBtu $4.26
TOTAL ENERGY COSTS $3,587,443
RECOMMENDED SAVINGS* $207,560 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,165
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$87,976
Cost:
$186,150
$87,976 1,119,286 - - $87,976
1,119,286
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,566
Cost:
$37,930
$45,566 579,724 - - $45,566
579,724
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$37,599
Cost:
$47,900
$37,599 478,358 - - $37,599
478,358
kWh
-
-
MMBtu
04: 2.7314 REDUCE VENTILATION AIR Savings:
$16,956
Cost:
$9,990
$10,535 134,042 $6,421 1,507 $10,535
134,042
kWh
$6,421
1,507
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,878
Cost:
$100
$14,878 189,286 - - $14,878
189,286
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,894
Cost:
$203
$2,894 36,815 - - $2,894
36,815
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,691
Cost:
$4,785
$1,691 21,513 - - $1,691
21,513
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$207,560
Cost:
$287,058
$201,139 2,559,024 $6,421 1,507 $201,139
2,559,024
kWh
$6,421
1,507
MMBtu
TOTAL IMPLEMENTED Savings:
$83,165
Cost:
$85,830
$83,165 1,058,082 - - $83,165
1,058,082
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas