IAC logo
IAC Assessment: MA0753
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0753
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product High precision optical glass
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3827 - Optical Instruments And Lenses
Sales $10,000,000-$50,000,000
# of Employees 141
Plant Area (Sq.Ft.) 85,500
Annual Production 72,000 Pounds
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $470,788 4,736,200 kWh $0.10
Electricity Demand $85,640 12,373 kW-months/year $6.92
Electricity Fees $(-559) - $ -
Natural Gas $40,017 6,156 MMBtu $6.50
TOTAL ENERGY COSTS $595,886
RECOMMENDED SAVINGS* $34,132 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,756
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,534
Cost:
$67,200
$19,600 197,184 $2,623 379 $(-3,689) (-792) $19,600
197,184
kWh
$2,623
379
kW-months/year
$(-3,689)
(-792)
MMBtu
02: 2.7314 REDUCE VENTILATION AIR Savings:
$7,290
Cost:
$5,575
$4,528 45,549 - - $2,762 449 $4,528
45,549
kWh
-
-
kW-months/year
$2,762
449
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$4,632
Cost:
$6,000
$4,632 46,604 - - - - $4,632
46,604
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,608
Cost:
$4,608
$1,608 16,174 - - - - $1,608
16,174
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,226
Cost:
$1,400
$1,226 12,333 - - - - $1,226
12,333
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$842
Cost:
$2,152
- - - - $842 136 -
-
kWh
-
-
kW-months/year
$842
136
MMBtu
TOTAL RECOMMENDED Savings:
$34,132
Cost:
$86,935
$31,594 317,844 $2,623 379 $(-85) (-207) $31,594
317,844
kWh
$2,623
379
kW-months/year
$(-85)
(-207)
MMBtu
TOTAL IMPLEMENTED Savings:
$14,756
Cost:
$17,583
$11,994 120,660 - - $2,762 449 $11,994
120,660
kWh
-
-
kW-months/year
$2,762
449
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas