IAC logo
IAC Assessment: MA0755
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0755
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2016
Principal Product Adhesive tape
NAICS 313230 - Nonwoven Fabric Mills
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 24
Plant Area (Sq.Ft.) 23,506
Annual Production 3,164 Thousand Feet
Production Hrs. Annual 6,000
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,519 403,200 kWh $0.13
Electricity Demand $10,408 1,362 kW-months/year $7.64
Electricity Fees $1,620 - $ -
Natural Gas $152,493 17,496 MMBtu $8.72
TOTAL ENERGY COSTS $215,040
RECOMMENDED SAVINGS* $142,388 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,196
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$73,133
Cost:
$200,000
$(-5,492) (-43,935) $78,625 9,305 $(-5,492)
(-43,935)
kWh
$78,625
9,305
MMBtu
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$43,907
Cost:
$196,307
$43,907 351,257 - - $43,907
351,257
kWh
-
-
MMBtu
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$10,196
Cost:
$21,560
$10,196 81,564 - - $10,196
81,564
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,821
Cost:
$4,300
- - $9,821 1,148 -
-
kWh
$9,821
1,148
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,678
Cost:
$6,000
$2,678 21,421 - - $2,678
21,421
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,653
Cost:
$2,955
$2,653 21,225 - - $2,653
21,225
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$142,388
Cost:
$431,122
$53,942 431,532 $88,446 10,453 $53,942
431,532
kWh
$88,446
10,453
MMBtu
TOTAL IMPLEMENTED Savings:
$10,196
Cost:
$21,560
$10,196 81,564 - - $10,196
81,564
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas