IAC logo
IAC Assessment: MA0767
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0767
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2016
Principal Product Aircraft engine part repair and overhaul
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 132
Plant Area (Sq.Ft.) 35,000
Annual Production 7,800 Pieces
Production Hrs. Annual 6,084
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,858 2,659,175 kWh $0.11
Electricity Demand $135,159 10,491 kW-months/year $12.88
Electricity Fees $9,771 - $ -
Natural Gas $33,939 4,282 MMBtu $7.93
TOTAL ENERGY COSTS $478,727
RECOMMENDED SAVINGS* $48,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,353
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$30,841
Cost:
$74,750
$28,675 253,760 $6,453 501 $(-4,287) (-962) $28,675
253,760
kWh
$6,453
501
kW-months/year
$(-4,287)
(-962)
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,408
Cost:
$15,090
$7,821 69,212 $1,765 137 $(-1,178) (-262) $7,821
69,212
kWh
$1,765
137
kW-months/year
$(-1,178)
(-262)
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$7,620
Cost:
$3,955
$4,925 43,585 - - $2,695 606 $4,925
43,585
kWh
-
-
kW-months/year
$2,695
606
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$911
Cost:
$3,330
$911 8,059 - - - - $911
8,059
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$461
Cost:
$157
$461 4,076 - - - - $461
4,076
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$361
Cost:
$274
- - - - $361 81 -
-
kWh
-
-
kW-months/year
$361
81
MMBtu
TOTAL RECOMMENDED Savings:
$48,602
Cost:
$97,556
$42,793 378,692 $8,218 638 $(-2,409) (-537) $42,793
378,692
kWh
$8,218
638
kW-months/year
$(-2,409)
(-537)
MMBtu
TOTAL IMPLEMENTED Savings:
$9,353
Cost:
$7,716
$6,297 55,720 - - $3,056 687 $6,297
55,720
kWh
-
-
kW-months/year
$3,056
687
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas