Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2017 |
Principal Product | Powdered metal products |
NAICS | 332117 - Powder Metallurgy Part Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 88,000 |
Annual Production | 4,200,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,329,652 | 12,250,500 | kWh | $0.11 |
Electricity Demand | $86,859 | 22,158 | kW-months/year | $3.92 |
Electricity Fees | $2,400 | - | $ | - |
Natural Gas | $52,752 | 4,901 | MMBtu | $10.76 |
TOTAL ENERGY COSTS | $1,471,663 | |||
RECOMMENDED SAVINGS* | $146,303 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $90,487 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $90,487 Cost: $39,330 |
$90,487 | 830,155 | - | - | - | - |
$90,487 830,155 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $30,931 Cost: $24,720 |
$45,678 | 419,067 | $4,481 | 1,143 | $(-19,228) | (-1,787) |
$45,678 419,067 kWh |
$4,481 1,143 kW-months/year |
$(-19,228) (-1,787) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $12,391 Cost: $11,273 |
$12,391 | 113,638 | - | - | - | - |
$12,391 113,638 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT |
Savings: $8,620 Cost: $57,572 |
$8,620 | 79,080 | - | - | - | - |
$8,620 79,080 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,874 Cost: $7,200 |
$3,874 | 35,539 | - | - | - | - |
$3,874 35,539 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $146,303 Cost: $140,095 |
$161,050 | 1,477,479 | $4,481 | 1,143 | $(-19,228) | (-1,787) | $161,050 1,477,479 kWh |
$4,481 1,143 kW-months/year |
$(-19,228) (-1,787) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $90,487 Cost: $39,330 |
$90,487 | 830,155 | - | - | - | - | $90,487 830,155 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |