IAC Assessment: MA0773
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0773
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2017
Principal Product metal nozzles
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 60,000
Annual Production 24,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,440 1,452,733 kWh $0.12
Electricity Demand $60,299 4,577 kW-months/year $13.17
Electricity Fees $8,766 - $ -
LPG $103,573 7,028 MMBtu $14.74
TOTAL ENERGY COSTS $352,078
RECOMMENDED SAVINGS* $34,391 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,673
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,653
Cost:
$30,000
- - $16,653 1,130 -
-
kWh
$16,653
1,130
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,580
Cost:
$14,050
$8,580 69,196 - - $8,580
69,196
kWh
-
-
MMBtu
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$5,593
Cost:
$10,625
$(-6,167) (-49,761) $11,760 798 $(-6,167)
(-49,761)
kWh
$11,760
798
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,564
Cost:
$6,660
$1,564 12,611 - - $1,564
12,611
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,500
Cost:
$1,000
$1,500 12,098 - - $1,500
12,098
kWh
-
-
MMBtu
06: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$501
Cost:
$100
- - $501 34 -
-
kWh
$501
34
MMBtu
TOTAL RECOMMENDED Savings:
$34,391
Cost:
$62,435
$5,477 44,144 $28,914 1,962 $5,477
44,144
kWh
$28,914
1,962
MMBtu
TOTAL IMPLEMENTED Savings:
$15,673
Cost:
$25,675
$3,913 31,533 $11,760 798 $3,913
31,533
kWh
$11,760
798
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG