IAC logo
IAC Assessment: MA0781
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0781
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2017
Principal Product Aerospace Components
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 10,000 Units
Production Hrs. Annual 8,568
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,961 1,385,280 kWh $0.10
Electricity Demand $73,371 5,593 kW-months/year $13.12
Electricity Fees $5,011 - $ -
Natural Gas $28,061 1,524 MMBtu $18.41
TOTAL ENERGY COSTS $241,404
RECOMMENDED SAVINGS* $53,445 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$33,144
Cost:
$405,711
$33,144 341,692 - - - - $33,144
341,692
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,386
Cost:
$6,000
- - $7,386 522 - - -
-
kWh
$7,386
522
kW-months/year
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,896
Cost:
$61,500
$13,139 135,462 $8,186 624 $(-10,429) (-660) $13,139
135,462
kWh
$8,186
624
kW-months/year
$(-10,429)
(-660)
MMBtu
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,734
Cost:
$2,724
$1,734 17,873 - - - - $1,734
17,873
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$285
Cost:
$215
$285 2,930 - - - - $285
2,930
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$53,445
Cost:
$476,150
$48,302 497,957 $15,572 1,146 $(-10,429) (-660) $48,302
497,957
kWh
$15,572
1,146
kW-months/year
$(-10,429)
(-660)
MMBtu
TOTAL IMPLEMENTED Savings:
$2,019
Cost:
$2,939
$2,019 20,803 - - - - $2,019
20,803
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas