IAC logo
IAC Assessment: MA0782
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0782
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2017
Principal Product Machined products for WW and wter industry
NAICS 333515 - Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 17
Plant Area (Sq.Ft.) 110,625
Annual Production 52,000 Units
Production Hrs. Annual 4,160
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,440 1,466,290 kWh $0.11
Electricity Demand $25,739 4,731 kW-months/year $5.44
Electricity Fees $20,960 - $ -
LPG $34,545 1,924 MMBtu $17.95
TOTAL ENERGY COSTS $243,684
RECOMMENDED SAVINGS* $28,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,281
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,221
Cost:
$78,750
$29,174 262,832 $(-10,953) (-610) $29,174
262,832
kWh
$(-10,953)
(-610)
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,638
Cost:
$1,583
$7,638 68,807 - - $7,638
68,807
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,366
Cost:
$600
$2,366 21,313 - - $2,366
21,313
kWh
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$277
Cost:
$100
$277 2,499 - - $277
2,499
kWh
-
-
MMBtu
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$160
Cost:
$100
$160 1,447 - - $160
1,447
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,662
Cost:
$81,133
$39,615 356,898 $(-10,953) (-610) $39,615
356,898
kWh
$(-10,953)
(-610)
MMBtu
TOTAL IMPLEMENTED Savings:
$10,281
Cost:
$2,283
$10,281 92,619 - - $10,281
92,619
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG