IAC Assessment: MA0786
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0786
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2018
Principal Product Melted beverages - beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000 BBL
Production Hrs. Annual 8,760
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $357,336 4,316,000 kWh $0.08
Electricity Demand $128,666 9,299 kW-months/year $13.84
Electricity Fees $2,661 - $ -
Natural Gas $306,464 36,176 MMBtu $8.47
TOTAL ENERGY COSTS $1,185,211
RECOMMENDED SAVINGS* $59,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,791
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,650
Cost:
$11,256
$36,650 441,563 - - $36,650
441,563
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,389
Cost:
$13,527
$6,004 72,340 $4,385 542 $6,004
72,340
kWh
$4,385
542
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,232
Cost:
$1,000
$7,232 87,135 - - $7,232
87,135
kWh
-
-
MMBtu
04: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$4,126
Cost:
$500
$672 8,093 $3,454 427 $672
8,093
kWh
$3,454
427
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$542
Cost:
$1,820
- - $542 67 -
-
kWh
$542
67
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$559
Cost:
$360
$17 208 $542 67 $17
208
kWh
$542
67
MMBtu
TOTAL RECOMMENDED Savings:
$59,498
Cost:
$28,463
$50,575 609,339 $8,923 1,103 $50,575
609,339
kWh
$8,923
1,103
MMBtu
TOTAL IMPLEMENTED Savings:
$7,791
Cost:
$1,360
$7,249 87,343 $542 67 $7,249
87,343
kWh
$542
67
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas