IAC Center University of Massachusetts
Assessment Year 2018
Principal Product Hot stamp foil
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3497 - Metal Foil And Leaf
Sales $30,000,000
# of Employees 75
Plant Area (Sq.Ft.) 60,000
Annual Production 450,000 not found
Production Hrs. Annual 6,168
Location (State) MA
Source Yearly Cost Usage
Electricity Usage $509,937 4,640,250
Electricity Demand $238,300 11,760
Electricity Fees $2,676 -
Natural Gas $105,912 11,779
TOTAL ENERGY COSTS $856,825
RECOMMENDED SAVINGS* $102,893 *Non-energy impacts
included in savings.
IMPLEMENTED SAVINGS* $85,856
#|Description Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW/month $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$84,640
Cost:
$121,500
$95,066 864,235 $24,074 1,188 $(-34,500) (-3,933) $95,066
864,235
kWh
$24,074
1,188
kW/month
$(-34,500)
(-3,933)
MMBtu
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$14,204
Cost:
$51,700
$14,204 129,128 - - - - $14,204
129,128
kWh
-
-
kW/month
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,123
Cost:
$4,092
- - - - $2,123 242 -
-
kWh
-
-
kW/month
$2,123
242
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,216
Cost:
$852
$1,216 11,050 - - - - $1,216
11,050
kWh
-
-
kW/month
-
-
MMBtu
05: 2.2434 RECOVER HEAT FROM AIR COMPRESSOR Savings:
$710
Cost:
$2,583
- - - - $710 73 -
-
kWh
-
-
kW/month
$710
73
MMBtu
TOTAL RECOMMENDED Savings:
$102,893
Cost:
$180,727
$110,486 1,004,413 $24,074 1,188 $(-31,667) (-3,618) $110,486
1,004,413
kWh
$24,074
1,188
kW/month
$(-31,667)
(-3,618)
MMBtu
TOTAL IMPLEMENTED Savings:
$85,856
Cost:
$122,352
$96,282 875,285 $24,074 1,188 $(-34,500) (-3,933) $96,282
875,285
kWh
$24,074
1,188
kW/month
$(-34,500)
(-3,933)
MMBtu
$ kWh $ kW/month $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
Back to Top