IAC logo
IAC Assessment: MA0794
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0794
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2018
Principal Product Hot stamp foil
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3497 - Metal Foil And Leaf
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 60,000
Annual Production 450,000 Units
Production Hrs. Annual 6,168
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $509,937 4,640,250 kWh $0.11
Electricity Demand $238,300 11,760 kW-months/year $20.26
Electricity Fees $2,676 - $ -
Natural Gas $105,912 11,779 MMBtu $8.99
TOTAL ENERGY COSTS $856,825
RECOMMENDED SAVINGS* $102,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,856
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$84,640
Cost:
$121,500
$95,066 864,235 $24,074 1,188 $(-34,500) (-3,933) $95,066
864,235
kWh
$24,074
1,188
kW-months/year
$(-34,500)
(-3,933)
MMBtu
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$14,204
Cost:
$51,700
$14,204 129,128 - - - - $14,204
129,128
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,123
Cost:
$4,092
- - - - $2,123 242 -
-
kWh
-
-
kW-months/year
$2,123
242
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,216
Cost:
$852
$1,216 11,050 - - - - $1,216
11,050
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$710
Cost:
$2,583
- - - - $710 73 -
-
kWh
-
-
kW-months/year
$710
73
MMBtu
TOTAL RECOMMENDED Savings:
$102,893
Cost:
$180,727
$110,486 1,004,413 $24,074 1,188 $(-31,667) (-3,618) $110,486
1,004,413
kWh
$24,074
1,188
kW-months/year
$(-31,667)
(-3,618)
MMBtu
TOTAL IMPLEMENTED Savings:
$85,856
Cost:
$122,352
$96,282 875,285 $24,074 1,188 $(-34,500) (-3,933) $96,282
875,285
kWh
$24,074
1,188
kW-months/year
$(-34,500)
(-3,933)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas