IAC logo
IAC Assessment: MA0797
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0797
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2019
Principal Product Chisels and ppunches
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 77,000
Annual Production 2,500,000 Units
Production Hrs. Annual 8,496
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $237,575 1,860,768 kWh $0.13
Electricity Demand $68,424 4,063 kW-months/year $16.84
Electricity Fees $3,701 - $ -
Natural Gas $74,509 8,507 MMBtu $8.76
TOTAL ENERGY COSTS $384,209
RECOMMENDED SAVINGS* $23,603 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,739
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$12,419
Cost:
$18,225
$12,419 97,025 - - $12,419
97,025
kWh
-
-
MMBtu
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$4,247
Cost:
$16,050
$4,247 33,444 - - $4,247
33,444
kWh
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,353
Cost:
$500
$136 1,072 $3,217 378 $136
1,072
kWh
$3,217
378
MMBtu
04: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$2,739
Cost:
$3,000
$2,739 21,396 - - $2,739
21,396
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$845
Cost:
$500
$845 6,603 - - $845
6,603
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$23,603
Cost:
$38,275
$20,386 159,540 $3,217 378 $20,386
159,540
kWh
$3,217
378
MMBtu
TOTAL IMPLEMENTED Savings:
$2,739
Cost:
$3,000
$2,739 21,396 - - $2,739
21,396
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu