Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2019 |
Principal Product | Printing toys and games |
NAICS | 339930 - Doll, Toy, and Game Manufacturing |
SIC | 3944 - Games, Toys, and Children's Vehicles, Except Dolls and Bicycles |
Sales | $10,000,000-$50,000,000 |
# of Employees | 420 |
Plant Area (Sq.Ft.) | 1,200,000 |
Annual Production | 2,500,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,333,988 | 16,192,705 | kWh | $0.14 |
Electricity Demand | $195,913 | 37,388 | kW-months/year | $5.24 |
Electricity Fees | $124,422 | - | $ | - |
Natural Gas | $252,090 | 27,546 | MMBtu | $9.15 |
TOTAL ENERGY COSTS | $2,906,413 | |||
RECOMMENDED SAVINGS* | $78,783 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $63,803 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $39,625 Cost: $48,500 |
$39,625 | 275,174 | - | - | - | - |
$39,625 275,174 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $18,484 Cost: $80,000 |
$18,484 | 128,364 | - | - | - | - |
$18,484 128,364 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,569 Cost: $8,930 |
- | - | - | - | $7,569 | 827 |
- - kWh |
- - kW-months/year |
$7,569 827 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,904 Cost: $2,765 |
$3,904 | 27,113 | - | - | - | - |
$3,904 27,113 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,333 Cost: $1,801 |
$3,333 | 23,147 | - | - | - | - |
$3,333 23,147 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT |
Savings: $2,585 Cost: $500 |
$2,585 | 17,954 | - | - | - | - |
$2,585 17,954 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,849 Cost: $2,001 |
- | - | - | - | $1,849 | 202 |
- - kWh |
- - kW-months/year |
$1,849 202 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $922 Cost: $978 |
$809 | 5,616 | $113 | 22 | - | - |
$809 5,616 kWh |
$113 22 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $512 Cost: $200 |
$512 | 3,552 | - | - | - | - |
$512 3,552 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,783 Cost: $145,675 |
$69,252 | 480,920 | $113 | 22 | $9,418 | 1,029 | $69,252 480,920 kWh |
$113 22 kW-months/year |
$9,418 1,029 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $63,803 Cost: $132,502 |
$61,954 | 430,237 | - | - | $1,849 | 202 | $61,954 430,237 kWh |
- - kW-months/year |
$1,849 202 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |