IAC Assessment: MA0798
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0798
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2019
Principal Product Printing toys and games
NAICS 339930 - Doll, Toy, and Game Manufacturing
SIC 3944 - Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales $10,000,000-$50,000,000
# of Employees 420
Plant Area (Sq.Ft.) 1,200,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,333,988 16,192,705 kWh $0.14
Electricity Demand $195,913 37,388 kW-months/year $5.24
Electricity Fees $124,422 - $ -
Natural Gas $252,090 27,546 MMBtu $9.15
TOTAL ENERGY COSTS $2,906,413
RECOMMENDED SAVINGS* $78,783 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,803
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,625
Cost:
$48,500
$39,625 275,174 - - - - $39,625
275,174
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$18,484
Cost:
$80,000
$18,484 128,364 - - - - $18,484
128,364
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,569
Cost:
$8,930
- - - - $7,569 827 -
-
kWh
-
-
kW-months/year
$7,569
827
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,904
Cost:
$2,765
$3,904 27,113 - - - - $3,904
27,113
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,333
Cost:
$1,801
$3,333 23,147 - - - - $3,333
23,147
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$2,585
Cost:
$500
$2,585 17,954 - - - - $2,585
17,954
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,849
Cost:
$2,001
- - - - $1,849 202 -
-
kWh
-
-
kW-months/year
$1,849
202
MMBtu
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$922
Cost:
$978
$809 5,616 $113 22 - - $809
5,616
kWh
$113
22
kW-months/year
-
-
MMBtu
09: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$512
Cost:
$200
$512 3,552 - - - - $512
3,552
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$78,783
Cost:
$145,675
$69,252 480,920 $113 22 $9,418 1,029 $69,252
480,920
kWh
$113
22
kW-months/year
$9,418
1,029
MMBtu
TOTAL IMPLEMENTED Savings:
$63,803
Cost:
$132,502
$61,954 430,237 - - $1,849 202 $61,954
430,237
kWh
-
-
kW-months/year
$1,849
202
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas