IAC logo
IAC Assessment: MA0821
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0821
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Finished Textiles and Other Flocked Products
NAICS 313320 - Fabric Coating Mills
SIC 2269 - Finishing Plants, Nec
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 180,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 2,700
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,281 981,000 kWh $0.12
Electricity Demand $34,440 5,322 kW-months/year $6.47
Electricity Fees $2,676 - $ -
Natural Gas $88,784 10,150 MMBtu $8.75
TOTAL ENERGY COSTS $245,530
RECOMMENDED SAVINGS* $59,402 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$48,924
Cost:
$61,470
$9,930 82,749 - - $38,994 4,458 $9,930
82,749
kWh
-
-
kW-months/year
$38,994
4,458
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,991
Cost:
$23,275
$8,991 74,928 - - - - $8,991
74,928
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$997
Cost:
$1,400
- - $997 154 - - -
-
kWh
$997
154
kW-months/year
-
-
MMBtu
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$490
Cost:
$1,785
- - - - $490 56 -
-
kWh
-
-
kW-months/year
$490
56
MMBtu
TOTAL RECOMMENDED Savings:
$59,402
Cost:
$87,930
$18,921 157,677 $997 154 $39,484 4,514 $18,921
157,677
kWh
$997
154
kW-months/year
$39,484
4,514
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas