IAC Assessment: MA0823
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0823
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Water vessels
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3433 - Heating Equipment, Except Electric
Sales $100,000,000-$500,000,000
# of Employees 352
Plant Area (Sq.Ft.) 262,950
Annual Production 1,300,000 Units
Production Hrs. Annual 6,257
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,276,774 11,406,271 kWh $0.11
Electricity Demand $266,766 26,103 kW-months/year $10.22
Electricity Fees $26,400 - $ -
Natural Gas $652,084 78,254 MMBtu $8.33
TOTAL ENERGY COSTS $2,222,024
RECOMMENDED SAVINGS* $957,601 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$757,206
Cost:
$3,776,148
$1,200,852 10,721,895 $127,316 12,458 $(-367,247) (-44,072) $(-203,715) - $1,200,852
10,721,895
kWh
$127,316
12,458
kW-months/year
$(-367,247)
(-44,072)
MMBtu
$(-203,715)
-
$
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$111,102
Cost:
$465,300
$(-52,170) (-465,800) $(-9,729) (-952) $173,001 20,761 - - $(-52,170)
(-465,800)
kWh
$(-9,729)
(-952)
kW-months/year
$173,001
20,761
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$76,578
Cost:
$123,800
- - $76,578 7,493 - - - - -
-
kWh
$76,578
7,493
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,327
Cost:
$36,850
$6,958 62,126 $1,369 134 - - - - $6,958
62,126
kWh
$1,369
134
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,388
Cost:
$2,000
$4,388 39,181 - - - - - - $4,388
39,181
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$957,601
Cost:
$4,404,098
$1,160,028 10,357,402 $195,534 19,133 $(-194,246) (-23,311) $(-203,715) - $1,160,028
10,357,402
kWh
$195,534
19,133
kW-months/year
$(-194,246)
(-23,311)
MMBtu
$(-203,715)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes