IAC Assessment: MA0824
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0824
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Electrical Surface Mount Raceways
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 260,000
Annual Production 20,400,000 Pounds
Production Hrs. Annual 4,250
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,489 1,081,693 kWh $0.09
Electricity Demand $147,358 9,689 kW-months/year $15.21
Electricity Fees $10,255 - $ -
Natural Gas $365,183 59,457 MMBtu $6.14
TOTAL ENERGY COSTS $625,285
RECOMMENDED SAVINGS* $36,164 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,786
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1224 REPLACE BOILER Savings:
$15,999
Cost:
$29,000
- - - - $15,999 2,067 -
-
kWh
-
-
kW-months/year
$15,999
2,067
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$10,379
Cost:
$54,695
$4,082 42,964 $6,297 414 - - $4,082
42,964
kWh
$6,297
414
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,177
Cost:
$29,750
$6,177 65,025 - - - - $6,177
65,025
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,118
Cost:
$7,710
$2,118 22,292 - - - - $2,118
22,292
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$1,491
Cost:
$6,300
- - - - $1,491 228 -
-
kWh
-
-
kW-months/year
$1,491
228
MMBtu
TOTAL RECOMMENDED Savings:
$36,164
Cost:
$127,455
$12,377 130,281 $6,297 414 $17,490 2,295 $12,377
130,281
kWh
$6,297
414
kW-months/year
$17,490
2,295
MMBtu
TOTAL IMPLEMENTED Savings:
$9,786
Cost:
$43,760
$8,295 87,317 - - $1,491 228 $8,295
87,317
kWh
-
-
kW-months/year
$1,491
228
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas