IAC logo
IAC Assessment: MA0825
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0825
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2021
Principal Product Hook and Loop Fasteners
NAICS 339993 - Fastener, Button, Needle, and Pin Manufacturing
SIC 3965 - Fasteners, Buttons, Needles, & Pins
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 405,000
Annual Production 15,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,833 958,833 kWh $0.10
Electricity Demand $285,825 33,421 kW-months/year $8.55
Electricity Fees $7,600 - $ -
Natural Gas $1,921,200 312,278 MMBtu $6.15
TOTAL ENERGY COSTS $2,411,989
RECOMMENDED SAVINGS* $249,603 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $213,678
#|Description Savings
Cost
Status Electricity Demand Natural Gas Water Usage Water Disposal Electricity Demand Natural Gas Water Usage Water Disposal
$ kW-months/year $ MMBtu $ Tgal $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$93,702
Cost:
$30,000
$93,702 6,711 - - - - - - $93,702
6,711
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$54,067
Cost:
$150,000
- - $54,067 7,567 - - - - -
-
kW-months/year
$54,067
7,567
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$41,012
Cost:
$52,945
- - $12,743 2,057 $9,919 4,583 $18,350 4,583 -
-
kW-months/year
$12,743
2,057
MMBtu
$9,919
4,583
Tgal
$18,350
4,583
Tgal
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$35,925
Cost:
$3,200
- - $35,925 5,799 - - - - -
-
kW-months/year
$35,925
5,799
MMBtu
-
-
Tgal
-
-
Tgal
05: 3.4151 MINIMIZE WATER USAGE Savings:
$24,897
Cost:
$6,250
- - - - $8,736 4,036 $16,161 4,036 -
-
kW-months/year
-
-
MMBtu
$8,736
4,036
Tgal
$16,161
4,036
Tgal
TOTAL RECOMMENDED Savings:
$249,603
Cost:
$242,395
$93,702 6,711 $102,735 15,423 $18,655 8,620 $34,511 8,620 $93,702
6,711
kW-months/year
$102,735
15,423
MMBtu
$18,655
8,620
Tgal
$34,511
8,620
Tgal
TOTAL IMPLEMENTED Savings:
$213,678
Cost:
$239,195
$93,702 6,711 $66,810 9,624 $18,655 8,620 $34,511 8,620 $93,702
6,711
kW-months/year
$66,810
9,624
MMBtu
$18,655
8,620
Tgal
$34,511
8,620
Tgal
Savings
Cost
$ kW-months/year $ MMBtu $ Tgal $ Tgal
Electricity Demand Natural Gas Water Usage Water Disposal Electricity Demand Natural Gas Water Usage Water Disposal