Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2021 |
Principal Product | Precious Metals |
NAICS | 331410 - Nonferrous Metal (except Aluminum) Smelting and Refining |
SIC | 3339 - Primary Nonferrous Metals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 106 |
Plant Area (Sq.Ft.) | 61,000 |
Annual Production | 1,000,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $619,375 | 5,967,000 | kWh | $0.10 |
Electricity Demand | $264,628 | 18,492 | kW-months/year | $14.31 |
Electricity Fees | $(-86,001) | - | $ | - |
Natural Gas | $188,672 | 28,962 | MMBtu | $6.51 |
TOTAL ENERGY COSTS | $1,014,163 | |||
RECOMMENDED SAVINGS* | $67,815 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,594 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $32,062 Cost: $75,000 |
- | - | - | - | $18,246 | 2,801 | $6,583 | 1,210 | $7,233 | 1,210 |
- - kWh |
- - kW-months/year |
$18,246 2,801 MMBtu |
$6,583 1,210 Tgal |
$7,233 1,210 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,909 Cost: $26,950 |
$18,909 | 181,821 | - | - | - | - | - | - | - | - |
$18,909 181,821 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,022 Cost: $11,050 |
$6,022 | 57,907 | - | - | - | - | - | - | - | - |
$6,022 57,907 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $5,685 Cost: $2,000 |
- | - | - | - | - | - | - | - | $5,685 | 951 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$5,685 951 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $2,962 Cost: $10,800 |
$1,116 | 10,731 | $1,846 | 129 | - | - | - | - | - | - |
$1,116 10,731 kWh |
$1,846 129 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,374 Cost: $3,230 |
- | - | - | - | - | - | $655 | 120 | $719 | 120 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$655 120 Tgal |
$719 120 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $801 Cost: $1,550 |
- | - | - | - | $801 | 123 | - | - | - | - |
- - kWh |
- - kW-months/year |
$801 123 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $67,815 Cost: $130,580 |
$26,047 | 250,459 | $1,846 | 129 | $19,047 | 2,924 | $7,238 | 1,329 | $13,637 | 2,280 | $26,047 250,459 kWh |
$1,846 129 kW-months/year |
$19,047 2,924 MMBtu |
$7,238 1,329 Tgal |
$13,637 2,280 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,594 Cost: $28,950 |
$18,909 | 181,821 | - | - | - | - | - | - | $5,685 | 951 | $18,909 181,821 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$5,685 951 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal |