IAC Assessment: MA0828
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0828
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product Specialty paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $100,000,000-$500,000,000
# of Employees 57
Plant Area (Sq.Ft.) 80,000
Annual Production 22,782 Tons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,705,591 20,936,000 kWh $0.08
Electricity Demand $268,202 33,525 kW-months/year $8.00
Electricity Fees $207 - $ -
Fuel Oil #2 $52,871 3,774 MMBtu $14.01
Wood $740,756 349,213 MMBtu $2.12
TOTAL ENERGY COSTS $2,767,627
RECOMMENDED SAVINGS* $674,814 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$443,207
Cost:
$3,043,367
- - - - $53,012 24,994 - - - - $390,195 - -
-
kWh
-
-
kW-months/year
$53,012
24,994
MMBtu
-
-
$
-
-
$
$390,195
-
$
02: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$127,245
Cost:
$144,842
- - - - $127,245 59,993 - - - - - - -
-
kWh
-
-
kW-months/year
$127,245
59,993
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$64,198
Cost:
$280,195
$32,813 405,097 $3,984 498 - - - - $27,401 - - - $32,813
405,097
kWh
$3,984
498
kW-months/year
-
-
MMBtu
-
-
$
$27,401
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$29,256
Cost:
$3,515
- - - - $35,756 16,858 $(-6,500) - - - - - -
-
kWh
-
-
kW-months/year
$35,756
16,858
MMBtu
$(-6,500)
-
$
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,386
Cost:
$12,000
$8,578 105,900 $1,808 226 - - - - - - - - $8,578
105,900
kWh
$1,808
226
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$522
Cost:
$910
- - - - $522 246 - - - - - - -
-
kWh
-
-
kW-months/year
$522
246
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$674,814
Cost:
$3,484,829
$41,391 510,997 $5,792 724 $216,535 102,091 $(-6,500) - $27,401 - $390,195 - $41,391
510,997
kWh
$5,792
724
kW-months/year
$216,535
102,091
MMBtu
$(-6,500)
-
$
$27,401
-
$
$390,195
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Product