Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product Baked Goods and Bread
NAICS 311811 - Retail Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 125,000
Annual Production 89,271,242 Pounds
Production Hrs. Annual 8,760
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $662,073 9,436,623 kWh $0.07
Electricity Demand $387,920 21,966 kW-months/year $17.66
Electricity Fees $4,800 - $ -
Natural Gas $680,951 80,203 MMBtu $8.49
TOTAL ENERGY COSTS $1,772,267
RECOMMENDED SAVINGS* $36,457 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,025
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,572
Cost:
$40,722
- - - - $10,572 1,245 -
-
kWh
-
-
kW-months/year
$10,572
1,245
MMBtu
02: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$2,773
Cost:
$7,150
$2,138 30,556 $635 36 - - $2,138
30,556
kWh
$635
36
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$18,072
Cost:
$14,280
$(-2,939) (-41,981) $(-989) (-56) $22,000 2,591 $(-2,939)
(-41,981)
kWh
$(-989)
(-56)
kW-months/year
$22,000
2,591
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$680
Cost:
$750
- - - - $680 80 -
-
kWh
-
-
kW-months/year
$680
80
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,360
Cost:
$625
$3,248 46,401 $1,112 63 - - $3,248
46,401
kWh
$1,112
63
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$36,457
Cost:
$63,527
$2,447 34,976 $758 43 $33,252 3,916 $2,447
34,976
kWh
$758
43
kW-months/year
$33,252
3,916
MMBtu
TOTAL IMPLEMENTED Savings:
$14,025
Cost:
$48,622
$2,138 30,556 $635 36 $11,252 1,325 $2,138
30,556
kWh
$635
36
kW-months/year
$11,252
1,325
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas