IAC logo
IAC Assessment: MA0837
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0837
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product biomedical products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 42,960
Annual Production 50,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,714 1,533,200 kWh $0.14
Electricity Demand $22,308 3,050 kW-months/year $7.31
Electricity Fees $13,847 - $ -
Natural Gas $18,850 1,318 MMBtu $14.30
TOTAL ENERGY COSTS $273,153
RECOMMENDED SAVINGS* $41,083 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,576
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$13,524
Cost:
$1,250
- - - - $13,524 - - - -
-
kWh
-
-
kW-months/year
$13,524
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,317
Cost:
$2,500
$9,042 63,678 - - - - $3,275 229 $9,042
63,678
kWh
-
-
kW-months/year
-
-
$
$3,275
229
MMBtu
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$10,507
Cost:
$46,265
$8,108 57,102 $2,399 328 - - - - $8,108
57,102
kWh
$2,399
328
kW-months/year
-
-
$
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,956
Cost:
$500
$1,956 13,775 - - - - - - $1,956
13,775
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,463
Cost:
$625
$1,368 9,636 $95 13 - - - - $1,368
9,636
kWh
$95
13
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,316
Cost:
$600
- - - - - - $1,316 92 -
-
kWh
-
-
kW-months/year
-
-
$
$1,316
92
MMBtu
TOTAL RECOMMENDED Savings:
$41,083
Cost:
$51,740
$20,474 144,191 $2,494 341 $13,524 - $4,591 321 $20,474
144,191
kWh
$2,494
341
kW-months/year
$13,524
-
$
$4,591
321
MMBtu
TOTAL IMPLEMENTED Savings:
$30,576
Cost:
$5,475
$12,366 87,089 $95 13 $13,524 - $4,591 321 $12,366
87,089
kWh
$95
13
kW-months/year
$13,524
-
$
$4,591
321
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu