IAC Assessment: MA0843
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0843
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 13
Plant Area (Sq.Ft.) 50,000
Annual Production 1,168,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,172 1,415,904 kWh $0.15
Electricity Demand $51,489 3,318 kW-months/year $15.52
Electricity Fees $4,183 - $ -
Fuel Oil #2 $21,221 979 MMBtu $21.68
Other Gas $6,117 131 MMBtu $46.69
TOTAL ENERGY COSTS $298,853
RECOMMENDED SAVINGS* $344,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,678
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$296,604
Cost:
$860,419
$192,882 1,277,363 - - - - $103,722 - $192,882
1,277,363
kWh
-
-
kW-months/year
-
-
MMBtu
$103,722
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$24,566
Cost:
$213,470
$20,050 132,783 $4,516 291 - - - - $20,050
132,783
kWh
$4,516
291
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$11,001
Cost:
$6,450
$9,620 63,711 $1,381 89 - - - - $9,620
63,711
kWh
$1,381
89
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$7,677
Cost:
$3,875
$6,730 44,572 $947 61 - - - - $6,730
44,572
kWh
$947
61
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$3,850
Cost:
$54,864
$230 1,524 - - $3,620 167 - - $230
1,524
kWh
-
-
kW-months/year
$3,620
167
MMBtu
-
-
$
06: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$602
Cost:
$2,100
$524 3,469 $78 5 - - - - $524
3,469
kWh
$78
5
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$344,300
Cost:
$1,141,178
$230,036 1,523,422 $6,922 446 $3,620 167 $103,722 - $230,036
1,523,422
kWh
$6,922
446
kW-months/year
$3,620
167
MMBtu
$103,722
-
$
TOTAL IMPLEMENTED Savings:
$18,678
Cost:
$10,325
$16,350 108,283 $2,328 150 - - - - $16,350
108,283
kWh
$2,328
150
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes