IAC logo
IAC Assessment: MA0846
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0846
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Roller Ice and Water Shields
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $50,000,000-$100,000,000
# of Employees 92
Plant Area (Sq.Ft.) 108,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $254,067 3,610,000 kWh $0.07
Electricity Demand $178,047 7,296 kW-months/year $24.40
Electricity Fees $4,450 - $ -
Natural Gas $540,399 52,624 MMBtu $10.27
TOTAL ENERGY COSTS $1,041,245
RECOMMENDED SAVINGS* $181,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,773
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$128,459
Cost:
$1,302,718
$107,497 1,535,668 $20,962 859 - - $107,497
1,535,668
kWh
$20,962
859
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,916
Cost:
$5,542
- - - - $10,916 1,063 -
-
kWh
-
-
kW-months/year
$10,916
1,063
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$33,534
Cost:
$15,450
$324 4,631 - - $33,210 3,234 $324
4,631
kWh
-
-
kW-months/year
$33,210
3,234
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,290
Cost:
$625
$4,265 60,935 $2,025 83 - - $4,265
60,935
kWh
$2,025
83
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,483
Cost:
$4,908
$824 11,773 $659 27 - - $824
11,773
kWh
$659
27
kW-months/year
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$674
Cost:
$3,293
$454 6,490 $220 9 - - $454
6,490
kWh
$220
9
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$181,356
Cost:
$1,332,536
$113,364 1,619,497 $23,866 978 $44,126 4,297 $113,364
1,619,497
kWh
$23,866
978
kW-months/year
$44,126
4,297
MMBtu
TOTAL IMPLEMENTED Savings:
$7,773
Cost:
$5,533
$5,089 72,708 $2,684 110 - - $5,089
72,708
kWh
$2,684
110
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas