Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2023 |
Principal Product | Roller Ice and Water Shields |
NAICS | 324122 - Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952 - Asphalt Felts And Coatings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 92 |
Plant Area (Sq.Ft.) | 108,000 |
Annual Production | 4,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $254,067 | 3,610,000 | kWh | $0.07 |
Electricity Demand | $178,047 | 7,296 | kW-months/year | $24.40 |
Electricity Fees | $4,450 | - | $ | - |
Natural Gas | $540,399 | 52,624 | MMBtu | $10.27 |
TOTAL ENERGY COSTS | $1,041,245 | |||
RECOMMENDED SAVINGS* | $181,356 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,773 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $128,459 Cost: $1,302,718 |
$107,497 | 1,535,668 | $20,962 | 859 | - | - |
$107,497 1,535,668 kWh |
$20,962 859 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $10,916 Cost: $5,542 |
- | - | - | - | $10,916 | 1,063 |
- - kWh |
- - kW-months/year |
$10,916 1,063 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $33,534 Cost: $15,450 |
$324 | 4,631 | - | - | $33,210 | 3,234 |
$324 4,631 kWh |
- - kW-months/year |
$33,210 3,234 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,290 Cost: $625 |
$4,265 | 60,935 | $2,025 | 83 | - | - |
$4,265 60,935 kWh |
$2,025 83 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,483 Cost: $4,908 |
$824 | 11,773 | $659 | 27 | - | - |
$824 11,773 kWh |
$659 27 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $674 Cost: $3,293 |
$454 | 6,490 | $220 | 9 | - | - |
$454 6,490 kWh |
$220 9 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $181,356 Cost: $1,332,536 |
$113,364 | 1,619,497 | $23,866 | 978 | $44,126 | 4,297 | $113,364 1,619,497 kWh |
$23,866 978 kW-months/year |
$44,126 4,297 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,773 Cost: $5,533 |
$5,089 | 72,708 | $2,684 | 110 | - | - | $5,089 72,708 kWh |
$2,684 110 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |