IAC Assessment: MA0847
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0847
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 14
Plant Area (Sq.Ft.) 108,000
Annual Production 2,700,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $762,456 4,879,200 kWh $0.16
Electricity Demand $161,442 13,496 kW-months/year $11.96
Electricity Fees $22,176 - $ -
Natural Gas $41,148 5,085 MMBtu $8.09
TOTAL ENERGY COSTS $987,222
RECOMMENDED SAVINGS* $312,126 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $625
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$128,837
Cost:
$757,936
$94,085 602,037 $167 14 - - $34,585 - - - $94,085
602,037
kWh
$167
14
kW-months/year
-
-
MMBtu
$34,585
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,343
Cost:
$2,860
- - - - $1,343 166 - - - - -
-
kWh
-
-
kW-months/year
$1,343
166
MMBtu
-
-
$
-
-
$
03: 3.4132 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS Savings:
$103,500
Cost:
$219,500
- - - - - - - - $103,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$103,500
-
$
04: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$1,133
Cost:
$1,000
- - - - $1,133 140 - - - - -
-
kWh
-
-
kW-months/year
$1,133
140
MMBtu
-
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$56,228
Cost:
$127,450
$(-53,296) (-341,640) $(-5,598) (-468) - - - - $115,122 - $(-53,296)
(-341,640)
kWh
$(-5,598)
(-468)
kW-months/year
-
-
MMBtu
-
-
$
$115,122
-
$
06: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$10,538
Cost:
$3,700
$9,533 61,112 $1,005 84 - - - - - - $9,533
61,112
kWh
$1,005
84
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$625
Cost:
$966
$458 2,934 $167 14 - - - - - - $458
2,934
kWh
$167
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$9,922
Cost:
$11,600
$8,199 52,560 $1,723 144 - - - - - - $8,199
52,560
kWh
$1,723
144
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$312,126
Cost:
$1,125,012
$58,979 377,003 $(-2,536) (-212) $2,476 306 $34,585 - $218,622 - $58,979
377,003
kWh
$(-2,536)
(-212)
kW-months/year
$2,476
306
MMBtu
$34,585
-
$
$218,622
-
$
TOTAL IMPLEMENTED Savings:
$625
Cost:
$966
$458 2,934 $167 14 - - - - - - $458
2,934
kWh
$167
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost