IAC logo
IAC Assessment: MA0848
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0848
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Rubber seals and automotive trim parts
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 560
Plant Area (Sq.Ft.) 300,000
Annual Production 17,000,000 Units
Production Hrs. Annual 8,256
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $641,364 7,330,202 kWh $0.09
Electricity Demand $324,400 17,126 kW-months/year $18.94
Electricity Fees $16,283 - $ -
LPG $161,738 10,398 MMBtu $15.55
TOTAL ENERGY COSTS $1,189,747
RECOMMENDED SAVINGS* $343,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,465
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$285,734
Cost:
$2,502,664
$270,543 3,109,613 $15,191 802 $270,543
3,109,613
kWh
$15,191
802
kW-months/year
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$26,885
Cost:
$30,500
$20,710 238,057 $6,175 326 $20,710
238,057
kWh
$6,175
326
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,335
Cost:
$15,950
$14,335 164,765 - - $14,335
164,765
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,130
Cost:
$26,000
$11,130 127,929 - - $11,130
127,929
kWh
-
-
kW-months/year
05: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE Savings:
$5,306
Cost:
$6,125
$5,306 60,639 - - $5,306
60,639
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$343,390
Cost:
$2,581,239
$322,024 3,701,003 $21,366 1,128 $322,024
3,701,003
kWh
$21,366
1,128
kW-months/year
TOTAL IMPLEMENTED Savings:
$25,465
Cost:
$41,950
$25,465 292,694 - - $25,465
292,694
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand