IAC logo
IAC Assessment: MA0851
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0851
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $50,000,000-$100,000,000
# of Employees 19
Plant Area (Sq.Ft.) 229,194
Annual Production 372 Thousand Gallons
Production Hrs. Annual 3,500
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $359,827 1,386,560 kWh $0.26
Electricity Demand $175,571 5,812 kW-months/year $30.21
Electricity Fees $47,827 - $ -
Natural Gas $134,624 9,763 MMBtu $13.79
TOTAL ENERGY COSTS $753,834
RECOMMENDED SAVINGS* $233,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $166,002
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$135,448
Cost:
$385,041
$100,089 384,956 $14,775 489 - - - - - - $20,584 - $100,089
384,956
kWh
$14,775
489
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$20,584
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$43,839
Cost:
$169,678
$63,950 193,433 - - - - $(-14,953) (-1,116) $(-5,158) - - - $63,950
193,433
kWh
-
-
kW-months/year
-
-
$
$(-14,953)
(-1,116)
MMBtu
$(-5,158)
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$28,576
Cost:
$1,000
- - - - $28,576 - - - - - - - -
-
kWh
-
-
kW-months/year
$28,576
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,230
Cost:
$3,215
$13,034 50,130 $5,196 172 - - - - - - - - $13,034
50,130
kWh
$5,196
172
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$5,872
Cost:
$20,925
- - - - - - $5,872 452 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,872
452
MMBtu
-
-
$
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,544
Cost:
$5,977
$1,333 5,125 $211 7 - - - - - - - - $1,333
5,125
kWh
$211
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.2626 AVOID FROST FORMATION ON EVAPORATORS Savings:
$434
Cost:
$216
$374 1,438 $60 2 - - - - - - - - $374
1,438
kWh
$60
2
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$233,943
Cost:
$586,052
$178,780 635,082 $20,242 670 $28,576 - $(-9,081) (-664) $(-5,158) - $20,584 - $178,780
635,082
kWh
$20,242
670
kW-months/year
$28,576
-
$
$(-9,081)
(-664)
MMBtu
$(-5,158)
-
$
$20,584
-
$
TOTAL IMPLEMENTED Savings:
$166,002
Cost:
$392,234
$101,796 391,519 $15,046 498 $28,576 - - - - - $20,584 - $101,796
391,519
kWh
$15,046
498
kW-months/year
$28,576
-
$
-
-
MMBtu
-
-
$
$20,584
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost