Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Hook and Loop Fasteners
NAICS 339993 - Fastener, Button, Needle, and Pin Manufacturing
SIC 3965 - Fasteners, Buttons, Needles, & Pins
Sales $50,000,000-$100,000,000
# of Employees 205
Plant Area (Sq.Ft.) 420,000
Annual Production 15,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,383,331 15,983,143 kWh $0.09
Electricity Demand $624,551 73,172 kW-months/year $8.54
Electricity Fees $41,051 - $ -
Natural Gas $1,074,896 133,474 MMBtu $8.05
TOTAL ENERGY COSTS $3,123,829
RECOMMENDED SAVINGS* $1,275,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,034,369
Cost:
$4,078,943
$2,068,727 15,183,986 - - $(-206,873) - $(-538,989) (-66,928) $(-288,496) - $2,068,727
15,183,986
kWh
-
-
kW-months/year
$(-206,873)
-
$
$(-538,989)
(-66,928)
MMBtu
$(-288,496)
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$166,304
Cost:
$1,812,686
$160,065 1,692,032 $6,239 731 - - - - - - $160,065
1,692,032
kWh
$6,239
731
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,649
Cost:
$46,300
$9,509 100,513 $1,178 138 - - $9,962 1,237 - - $9,509
100,513
kWh
$1,178
138
kW-months/year
-
-
$
$9,962
1,237
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,456
Cost:
$15,900
$11,980 126,642 $1,476 173 - - - - - - $11,980
126,642
kWh
$1,476
173
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,753
Cost:
$40,550
- - - - - - $12,443 1,544 $(-690) - -
-
kWh
-
-
kW-months/year
-
-
$
$12,443
1,544
MMBtu
$(-690)
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$28,671
Cost:
$72,000
- - - - - - $28,671 3,560 - - -
-
kWh
-
-
kW-months/year
-
-
$
$28,671
3,560
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,275,202
Cost:
$6,066,379
$2,250,281 17,103,173 $8,893 1,042 $(-206,873) - $(-487,913) (-60,587) $(-289,186) - $2,250,281
17,103,173
kWh
$8,893
1,042
kW-months/year
$(-206,873)
-
$
$(-487,913)
(-60,587)
MMBtu
$(-289,186)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes