IAC logo
IAC Assessment: MA0861
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0861
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Municipal Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 17
Plant Area (Sq.Ft.) 37,028
Annual Production 1,022,100 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,216 2,716,800 kWh $0.15
Electricity Demand $44,472 5,097 kW-months/year $8.73
Electricity Fees $2,676 - $ -
Fuel Oil #2 $78,861 2,872 MMBtu $27.46
TOTAL ENERGY COSTS $529,225
RECOMMENDED SAVINGS* $172,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$98,833
Cost:
$861,320
$42,064 284,215 $7,338 842 $49,431 - $42,064
284,215
kWh
$7,338
842
kW-months/year
$49,431
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$54,846
Cost:
$17,375
$50,745 342,872 $4,101 470 - - $50,745
342,872
kWh
$4,101
470
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,273
Cost:
$19,000
$9,505 64,226 $768 88 - - $9,505
64,226
kWh
$768
88
kW-months/year
-
-
$
04: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$7,254
Cost:
$18,500
$6,242 42,179 $1,012 116 - - $6,242
42,179
kWh
$1,012
116
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,245
Cost:
$1,250
$1,149 7,766 $96 11 - - $1,149
7,766
kWh
$96
11
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$172,451
Cost:
$917,445
$109,705 741,258 $13,315 1,527 $49,431 - $109,705
741,258
kWh
$13,315
1,527
kW-months/year
$49,431
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes