IAC logo
IAC Assessment: MAS016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MAS016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product nozzles
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 60,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 6,732
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,614 1,691,280 kWh $0.10
Electricity Demand $65,578 5,319 kW-months/year $12.33
Electricity Fees $8,400 - $ -
LPG $115,014 5,524 MMBtu $20.82
TOTAL ENERGY COSTS $358,606
RECOMMENDED SAVINGS* $31,499 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,510
Cost:
$5,600
$17,638 176,380 $3,872 314 - - - - $17,638
176,380
kWh
$3,872
314
kW-months/year
-
-
Tgal
-
-
$
02: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$79
Cost:
$375
- - - - $79 8,560 - - -
-
kWh
-
-
kW-months/year
$79
8,560
Tgal
-
-
$
03: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$9,910
Cost:
-
- - - - - - $9,910 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$9,910
-
$
TOTAL RECOMMENDED Savings:
$31,499
Cost:
$5,975
$17,638 176,380 $3,872 314 $79 8,560 $9,910 - $17,638
176,380
kWh
$3,872
314
kW-months/year
$79
8,560
Tgal
$9,910
-
$
TOTAL IMPLEMENTED Savings:
$31,420
Cost:
$5,600
$17,638 176,380 $3,872 314 - - $9,910 - $17,638
176,380
kWh
$3,872
314
kW-months/year
-
-
Tgal
$9,910
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes