IAC logo
IAC Assessment: MAS020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MAS020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Butter and Milk Products
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 75
Plant Area (Sq.Ft.) 78,000
Annual Production 106,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $939,616 10,623,360 kWh $0.09
Electricity Demand $307,529 24,942 kW-months/year $12.33
Natural Gas $1,241,796 135,603 MMBtu $9.16
TOTAL ENERGY COSTS $2,488,941
RECOMMENDED SAVINGS* $79,862 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,042
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$32,764
Cost:
$7,000
$32,764 370,363 - - $32,764
370,363
kWh
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$29,617
Cost:
$60,000
- - $29,617 3,530 -
-
kWh
$29,617
3,530
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,203
Cost:
$7,700
$11,203 126,728 - - $11,203
126,728
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,667
Cost:
$11,600
$4,667 52,797 - - $4,667
52,797
kWh
-
-
MMBtu
05: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$1,611
Cost:
$500
- - $1,611 192 -
-
kWh
$1,611
192
MMBtu
TOTAL RECOMMENDED Savings:
$79,862
Cost:
$86,800
$48,634 549,888 $31,228 3,722 $48,634
549,888
kWh
$31,228
3,722
MMBtu
TOTAL IMPLEMENTED Savings:
$39,042
Cost:
$19,100
$37,431 423,160 $1,611 192 $37,431
423,160
kWh
$1,611
192
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas