IAC logo
IAC Assessment: MAS022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MAS022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Metal Finishing
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 64
Plant Area (Sq.Ft.) 140,000
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 2,600
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,082 1,200,958 kWh $0.11
Electricity Demand $21,899 5,587 kW-months/year $3.92
Electricity Fees $2,400 - $ -
Natural Gas $255,721 32,634 MMBtu $7.84
TOTAL ENERGY COSTS $414,102
RECOMMENDED SAVINGS* $27,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,049
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$19,167
Cost:
$20,900
- - - - $19,167 2,658 -
-
kWh
-
-
kW-months/year
$19,167
2,658
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,821
Cost:
$2,600
$4,821 43,048 - - - - $4,821
43,048
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,186
Cost:
$4,660
$1,818 16,230 $368 94 - - $1,818
16,230
kWh
$368
94
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$875
Cost:
-
$824 7,358 $51 13 - - $824
7,358
kWh
$51
13
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,049
Cost:
$28,160
$7,463 66,636 $419 107 $19,167 2,658 $7,463
66,636
kWh
$419
107
kW-months/year
$19,167
2,658
MMBtu
TOTAL IMPLEMENTED Savings:
$27,049
Cost:
$28,160
$7,463 66,636 $419 107 $19,167 2,658 $7,463
66,636
kWh
$419
107
kW-months/year
$19,167
2,658
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas