IAC logo
IAC Assessment: ME0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Machine Shop/Foundry
NAICS n/a
SIC 3366 - Copper Foundries
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 28,000
Annual Production 0 Units
Production Hrs. Annual 2,100
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,809 203,693 kWh $0.14
LPG $1,198 77 MMBtu $15.56
Fuel Oil #6 $20,796 5,644 MMBtu $3.68
TOTAL ENERGY COSTS $49,803
RECOMMENDED SAVINGS* $3,782 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,782
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Fuel Oil #6 Electricity Usage Fuel Oil #2 Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$599
Cost:
$471
- - $599 165 - - -
-
kWh
$599
165
MMBtu
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$845
Cost:
$1,000
- - $845 203 - - -
-
kWh
$845
203
MMBtu
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,592
Cost:
$3,500
$1,790 14,654 - - $(-198) (-62) $1,790
14,654
kWh
-
-
MMBtu
$(-198)
(-62)
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$412
Cost:
$950
$486 5,275 - - $(-74) (-23) $486
5,275
kWh
-
-
MMBtu
$(-74)
(-23)
MMBtu
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$334
Cost:
$400
- - $334 92 - - -
-
kWh
$334
92
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,782
Cost:
$6,321
$2,276 19,929 $1,778 460 $(-272) (-85) $2,276
19,929
kWh
$1,778
460
MMBtu
$(-272)
(-85)
MMBtu
TOTAL IMPLEMENTED Savings:
$3,782
Cost:
$6,321
$2,276 19,929 $1,778 460 $(-272) (-85) $2,276
19,929
kWh
$1,778
460
MMBtu
$(-272)
(-85)
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Fuel Oil #2 Fuel Oil #6 Electricity Usage Fuel Oil #2 Fuel Oil #6