IAC Assessment: ME0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1993
Principal Product Woolen Cloth
NAICS n/a
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 6,667 Thousand Feet
Production Hrs. Annual 6,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,091 2,629,543 kWh $0.09
LPG $3,355 433 MMBtu $7.75
Fuel Oil #6 $133,944 54,500 MMBtu $2.46
TOTAL ENERGY COSTS $376,390
RECOMMENDED SAVINGS* $141,113 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,565
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Fuel Oil #6 Electricity Usage Fuel Oil #2 Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,628
Cost:
$800
- - $1,628 662 - - -
-
kWh
$1,628
662
MMBtu
-
-
MMBtu
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$106,916
Cost:
$100,000
$214,620 2,360,199 $(-120,245) (-24,049) $12,541 5,098 $214,620
2,360,199
kWh
$(-120,245)
(-24,049)
MMBtu
$12,541
5,098
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,882
Cost:
$2,500
$1,882 - - - - - $1,882
-
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,080
Cost:
$3,000
- - $1,080 360 - - -
-
kWh
$1,080
360
MMBtu
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$965
Cost:
$100
$965 10,551 - - - - $965
10,551
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$25,600
Cost:
$2,000
$25,600 281,946 - - - - $25,600
281,946
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$3,042
Cost:
-
$3,042 - - - - - $3,042
-
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$141,113
Cost:
$108,400
$246,109 2,652,696 $(-117,537) (-23,027) $12,541 5,098 $246,109
2,652,696
kWh
$(-117,537)
(-23,027)
MMBtu
$12,541
5,098
MMBtu
TOTAL IMPLEMENTED Savings:
$26,565
Cost:
$2,100
$26,565 292,497 - - - - $26,565
292,497
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Fuel Oil #2 Fuel Oil #6 Electricity Usage Fuel Oil #2 Fuel Oil #6