Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1993 |
Principal Product | Woolen Cloth |
NAICS | n/a |
SIC | 2231 - Broadwoven Fabric Mills, Wool |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 6,667 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $239,091 | 2,629,543 | kWh | $0.09 |
LPG | $3,355 | 433 | MMBtu | $7.75 |
Fuel Oil #6 | $133,944 | 54,500 | MMBtu | $2.46 |
TOTAL ENERGY COSTS | $376,390 | |||
RECOMMENDED SAVINGS* | $141,113 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,565 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Fuel Oil #6 | Electricity Usage | Fuel Oil #2 | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,628 Cost: $800 |
- | - | $1,628 | 662 | - | - |
- - kWh |
$1,628 662 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $106,916 Cost: $100,000 |
$214,620 | 2,360,199 | $(-120,245) | (-24,049) | $12,541 | 5,098 |
$214,620 2,360,199 kWh |
$(-120,245) (-24,049) MMBtu |
$12,541 5,098 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,882 Cost: $2,500 |
$1,882 | - | - | - | - | - |
$1,882 - kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $1,080 Cost: $3,000 |
- | - | $1,080 | 360 | - | - |
- - kWh |
$1,080 360 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $965 Cost: $100 |
$965 | 10,551 | - | - | - | - |
$965 10,551 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $25,600 Cost: $2,000 |
$25,600 | 281,946 | - | - | - | - |
$25,600 281,946 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $3,042 Cost: - |
$3,042 | - | - | - | - | - |
$3,042 - kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $141,113 Cost: $108,400 |
$246,109 | 2,652,696 | $(-117,537) | (-23,027) | $12,541 | 5,098 | $246,109 2,652,696 kWh |
$(-117,537) (-23,027) MMBtu |
$12,541 5,098 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,565 Cost: $2,100 |
$26,565 | 292,497 | - | - | - | - | $26,565 292,497 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Fuel Oil #6 | Electricity Usage | Fuel Oil #2 | Fuel Oil #6 |