IAC logo
IAC Assessment: ME0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Sausage and Hams
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 40,000
Annual Production 7,500 Tons
Production Hrs. Annual 1,960
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $310,790 3,771,395 kWh $0.08
LPG $466 24 MMBtu $19.42
Fuel Oil #4 $102,451 36,260 MMBtu $2.83
TOTAL ENERGY COSTS $413,707
RECOMMENDED SAVINGS* $26,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,700
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 3.4151 MINIMIZE WATER USAGE Savings:
$21,700
Cost:
$12,150
$5,219 63,306 $16,481 1,911 $5,219
63,306
kWh
$16,481
1,911
MMBtu
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$403
Cost:
$600
- - $403 145 -
-
kWh
$403
145
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,555
Cost:
$100
$1,555 18,757 - - $1,555
18,757
kWh
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,327
Cost:
$2,280
$1,327 - - - $1,327
-
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,504
Cost:
$4,415
$1,504 18,171 - - $1,504
18,171
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,489
Cost:
$19,545
$9,605 100,234 $16,884 2,056 $9,605
100,234
kWh
$16,884
2,056
MMBtu
TOTAL IMPLEMENTED Savings:
$21,700
Cost:
$12,150
$5,219 63,306 $16,481 1,911 $5,219
63,306
kWh
$16,481
1,911
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2