IAC logo
IAC Assessment: ME0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Turbine Diaphrams
NAICS n/a
SIC 3511 - Turbines And Turbine Generator Sets
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 90,000
Annual Production 150 Pieces
Production Hrs. Annual 4,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $335,211 3,690,211 kWh $0.09
Fuel Oil #6 $8,630 3,869 MMBtu $2.23
TOTAL ENERGY COSTS $343,841
RECOMMENDED SAVINGS* $28,204 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,831
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$25,173
Cost:
$80,000
$41,719 485,053 $(-16,546) (-2,363) - - $41,719
485,053
kWh
$(-16,546)
(-2,363)
MMBtu
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$658
Cost:
$200
$658 7,327 - - - - $658
7,327
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$263
Cost:
$6,000
$263 3,224 - - - - $263
3,224
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$205
Cost:
$400
- - - - $205 68 -
-
kWh
-
-
MMBtu
$205
68
MMBtu
05: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS Savings:
$1,905
Cost:
$1,500
$1,905 25,498 - - - - $1,905
25,498
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,204
Cost:
$88,100
$44,545 521,102 $(-16,546) (-2,363) $205 68 $44,545
521,102
kWh
$(-16,546)
(-2,363)
MMBtu
$205
68
MMBtu
TOTAL IMPLEMENTED Savings:
$25,831
Cost:
$80,200
$42,377 492,380 $(-16,546) (-2,363) - - $42,377
492,380
kWh
$(-16,546)
(-2,363)
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6