Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1994 |
Principal Product | Turbine Diaphrams |
NAICS | n/a |
SIC | 3511 - Turbines And Turbine Generator Sets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 150 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $335,211 | 3,690,211 | kWh | $0.09 |
Fuel Oil #6 | $8,630 | 3,869 | MMBtu | $2.23 |
TOTAL ENERGY COSTS | $343,841 | |||
RECOMMENDED SAVINGS* | $28,204 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,831 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #6 | Electricity Usage | Natural Gas | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $25,173 Cost: $80,000 |
$41,719 | 485,053 | $(-16,546) | (-2,363) | - | - |
$41,719 485,053 kWh |
$(-16,546) (-2,363) MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $658 Cost: $200 |
$658 | 7,327 | - | - | - | - |
$658 7,327 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $263 Cost: $6,000 |
$263 | 3,224 | - | - | - | - |
$263 3,224 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $205 Cost: $400 |
- | - | - | - | $205 | 68 |
- - kWh |
- - MMBtu |
$205 68 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS |
Savings: $1,905 Cost: $1,500 |
$1,905 | 25,498 | - | - | - | - |
$1,905 25,498 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,204 Cost: $88,100 |
$44,545 | 521,102 | $(-16,546) | (-2,363) | $205 | 68 | $44,545 521,102 kWh |
$(-16,546) (-2,363) MMBtu |
$205 68 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,831 Cost: $80,200 |
$42,377 | 492,380 | $(-16,546) | (-2,363) | - | - | $42,377 492,380 kWh |
$(-16,546) (-2,363) MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #6 | Electricity Usage | Natural Gas | Fuel Oil #6 |