IAC logo
IAC Assessment: ME0123
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0123
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product HVAC Equip.
NAICS n/a
SIC 3399 - Primary Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 67,500
Annual Production 100 Pieces
Production Hrs. Annual 4,160
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,758 763,775 kWh $0.09
LPG $2,845 283 MMBtu $10.05
Fuel Oil #2 $6,872 1,076 MMBtu $6.39
TOTAL ENERGY COSTS $77,475
RECOMMENDED SAVINGS* $27,144 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,390
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,352
Cost:
$500
- - $2,352 368 -
-
kWh
$2,352
368
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,038
Cost:
$1,500
$2,038 20,516 - - $2,038
20,516
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$722
Cost:
$500
$722 7,327 - - $722
7,327
kWh
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$816
Cost:
$750
$1,046 10,551 $(-230) (-36) $1,046
10,551
kWh
$(-230)
(-36)
MMBtu
05: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$21,216
Cost:
$52,000
$61,776 623,974 $(-40,560) (-2,129) $61,776
623,974
kWh
$(-40,560)
(-2,129)
MMBtu
TOTAL RECOMMENDED Savings:
$27,144
Cost:
$55,250
$65,582 662,368 $(-38,438) (-1,797) $65,582
662,368
kWh
$(-38,438)
(-1,797)
MMBtu
TOTAL IMPLEMENTED Savings:
$4,390
Cost:
$2,000
$2,038 20,516 $2,352 368 $2,038
20,516
kWh
$2,352
368
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2