IAC Assessment: ME0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Dyed Wool Fabrics
NAICS n/a
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 160,000
Annual Production 18,000 Thousand Feet
Production Hrs. Annual 5,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $652,506 7,854,045 kWh $0.08
LPG $79,374 15,273 MMBtu $5.20
Fuel Oil #2 $3,690 840 MMBtu $4.39
Fuel Oil #6 $266,615 120,958 MMBtu $2.20
TOTAL ENERGY COSTS $1,002,185
RECOMMENDED SAVINGS* $100,086 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Fuel Oil #6 Electricity Usage Fuel Oil #2 Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,318
Cost:
$2,800
- - - - $1,318 598 -
-
kWh
-
-
MMBtu
$1,318
598
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,574
Cost:
$9,200
$4,574 - - - - - $4,574
-
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,730
Cost:
$200
$1,730 20,809 - - - - $1,730
20,809
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,717
Cost:
$4,300
$6,118 73,564 $(-1,165) (-165) $(-236) (-86) $6,118
73,564
kWh
$(-1,165)
(-165)
MMBtu
$(-236)
(-86)
MMBtu
05: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$54,000
Cost:
$110,000
$249,000 3,000,879 $(-195,000) (-10,236) - - $249,000
3,000,879
kWh
$(-195,000)
(-10,236)
MMBtu
-
-
MMBtu
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$16,980
Cost:
$18,000
- - - - $16,980 6,174 -
-
kWh
-
-
MMBtu
$16,980
6,174
MMBtu
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$16,767
Cost:
$9,000
$16,767 201,641 - - - - $16,767
201,641
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$100,086
Cost:
$153,500
$278,189 3,296,893 $(-196,165) (-10,401) $18,062 6,686 $278,189
3,296,893
kWh
$(-196,165)
(-10,401)
MMBtu
$18,062
6,686
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Fuel Oil #2 Fuel Oil #6 Electricity Usage Fuel Oil #2 Fuel Oil #6